• HOME
  • ABOUT US
  • PRODUCT
  • NEWS
  • CASES
  • HR
  • CONTACT
  • 工厂地址:成都新津县川浙工业合作园A区兴园8路429号  邮箱:lukechenxi@vip.163.com   电话:13908219962  传真:028-82550605

    ©四川路加四通科技有限公司   网站建设:中企动力 成都  蜀ICP备18006121号

    NEWS

    新闻动态

    以人为本拓市场,以质为本立市场

    HUMAN-ORIENTED EXTENSION MARKET , WITH QUALITY AS THE LOCAL MARKET

    >
    >
    >
    The First Announcement of Environmental Impact Assessment of Concrete, Mortar and Other Additives Technological Reform Projects

    The First Announcement of Environmental Impact Assessment of Concrete, Mortar and Other Additives Technological Reform Projects

    Classification:
    Company news
    Release time:
    2018/12/13

    Abstract:

    Evaluation and Publication of Environmental Impact Assessment of Concrete and Mortar Additives Technological Reform Projects of Sichuan Lujia Sitong Science and Technology Development Co., Ltd.

    Friends of the general public:

    Sichuan Lujia Sitong Science and Technology Development Co., Ltd. (hereinafter referred to as "our company") intends to implement the technical renovation project of concrete and mortar and other additives in No. 429 Xingyuan Eighth Road, Area A, Xinjin Industrial Park, Chengdu, in accordance with the Environmental Impact Assessment Law of the People's Republic of China, the Regulations on Environmental Protection Management of Construction Projects and the Interim Measures for Public Participation in Environmental Impact Assessment (No. 28, 2006), etc. As required by laws and regulations, the information on public participation in environmental impact assessment of projects is announced as follows. The public friends, enterprises and institutions are invited to give feedback on environmental protection related opinions to the compiling units of environmental impact assessment reports entrusted by our units and our units.

    I. Project Name and Summary

    Project Name: Technical Reform Project of Concrete, Mortar and Other Additives

    Nature: Renovation

    Location: 429 Xingyuan Eighth Road, Area A, Xinjin Industrial Park, Chengdu

    Construction Unit: Sichuan Lujia Sitong Science and Technology Development Co., Ltd.

    Total project investment: 3 million yuan

    Construction Content and Scale: The existing workshop and equipment are used for technical renovation. After technical renovation, the production capacity of admixture reaches 160,000 tons of mother liquor and the product of admixture mix reaches 250,000 tons.

    This project is a reconstruction project. The original project and its environmental protection are as follows:

    The project was approved by Chengdu Environmental Protection Bureau (Chengdu Environmental Protection Bureau) on October 12, 2005 (duplicate No. 483). In 2007, due to the change of raw materials and process flow, Post-environmental impact assessment was carried out according to the requirements of Chengdu Environmental Protection Bureau. On August 23, 2007, the project was approved by Chengdu Environmental Protection Bureau (Chengdu Environmental Protection Bureau) (duplicate No. 651). On December 27, 2007, the environmental protection acceptance check and acceptance of the completed project (Chengdu Environmental Construction Inspection [2007] 039) was completed. The main environmental protection measures adopted are as follows: the production process exhaust gas is discharged through a purification tower with a height of 18m, the gas boiler exhaust gas is discharged through a height of 8m, and the cooking hall kitchen is equipped with a lampblack purifier; the waste water is discharged into the Xinjin County Municipal Sewage Treatment Plant through the municipal sewage pipe network of the park for treatment; the domestic waste is cleaned and transported by the environmental protection department.

    In 2010, the new powder production line project was approved by Xinjin Environmental Protection Bureau on February 1, 2010 (Xinjin Environmental Protection Bureau, [2010] 003). On February 24, 2012, the environmental protection acceptance of the powder production line project was completed (Xinjin Environmental Protection Bureau, [2012] 001). The main environmental protection measures adopted are as follows: the exhaust gas of drying system is purified by high efficiency cyclone separator + primary water film dust collector + secondary scrubbing tower dust collector system.

    II. Situation of Construction Units

    Construction Unit: Sichuan Lujia Sitong Science and Technology Development Co., Ltd.

    Address: 429 Xingyuan Eighth Road, Area A, Xinjin Industrial Park, Chengdu

    Contact person: Ms. Zeng

    Contact number: 18980996770

    Zip code: 611430

    E-mail: 2307369499@qq.com

    III. Name and contact information of EIA units

    Relevant Information Table of Environmental Impact Assessment Units

    Environmental Assessment Unit Name Central Huacheng (Xiamen) Environmental Protection Technology Co., Ltd.

    Qualification Certificate No. 2224 of National Environmental Assessment Certificate B

    Project leader Yang Xiaojin (B222402202) 13882175919

    Contact number of EIA units 0592-5996129 (Xiamen) 028-85216166 (Chengdu)

    Registration Address Room 101, No. 8 Guanri Road, Software Park, Siming District, Xiamen City, Fujian Province

    Room 914, Building 7, Phase 2 of Poly Heart Language, 1606 Fuhua South Road, Chengdu High-tech Zone, Chengdu

    E-mail 455612583@qq.com

    IV. Procedures and Main Contents of Environmental Impact Assessment

    Environmental impact assessment (EIA) is to analyze, predict and evaluate the possible environmental impacts caused by the implementation of construction projects, to put forward countermeasures and measures to prevent or mitigate adverse environmental impacts, and to track and monitor the methods.

    Specific working procedures: After receiving the letter of attorney, the EIA organization organizes the EIA task group to carry out its work. Firstly, on-site investigation is carried out in the location of the proposed project, and then data collection is carried out to determine environmental problems and environmental factors, and to clarify environmental protection objectives; through engineering analysis and pollution impact analysis, environmental impact factors are screened to determine the source strength; through current situation investigation and monitoring, environmental air, water and acoustic environment are evaluated, and the current situation of the ecological environment is adjusted. Check and evaluate the scope and extent of the environmental impact of pollutants discharged after the completion of the project, and draw a conclusion whether the project can be accepted by the environment. Finally, the above contents are compiled into an environmental impact report and submitted to the competent administrative department of environmental protection for examination and approval.

    5. Internet links to public opinion forms

    The network link of the public opinion form is attached.

    I. Main Ways of Public Opinion

    The public can submit the completed form of public opinion to our unit and the entrusted environmental impact assessment unit within the prescribed time by means of e-mail, letter and fax, reflecting the opinions and suggestions related to the environmental impact of construction projects.

    Publicity time: 10 working days from the date of publication.

    Note: During the preparation of the draft of the environmental impact report, the public can put forward relevant opinions on environmental impact assessment to the construction units.

    Publicity time: December 13, 2018 to December 27, 2018

    四川路加四通科技发展有限公司

    四川路加四通科技发展有限公司